Parkway South

This contract includes construction of the Parkway from the southerly abutment of the River Bridge through to Central and Ledge Streets. This includes most of the construction within the Millyard.

The roadway cross section includes 2 11-foot travel ways and an 11-foot painted turn lane to facilitate left turns within the Millyard.

The work includes a new signalized intersection near the location of the Millyard Chimney and sidewalks along the length of the Parkway.
Parkway South Project Map